Works supervision and management

Here at Vibux we know that one of the major assets afforded by BIM is the safe planning, organisation and execution of works. In this way we bring quality to the building process.
Home > Works supervision and management
WORKS’ COORDINATION

MODEL COORDINATION

The coordination of the structure and the installations at the works’ site is a complex process which generates imbalances in budgets and programming. BIM allows us to resolve interference and avoid conflicts.

Traditionally, in construction projects the design of each of the disciplines has been prepared individually. The process within a CAD environment is so complex that the coordination of these plans was carried out directly in-situ. This led to a large number of conflicts between suppliers, the need for redesign, adjustments, unexpected material orders etc. and it meant envisaging time for this process. In our case, the structure and MEP (mechanical, electrical and plumbing) models shall be included at the design stage and the Vibux coordinator will make the necessary adjustments so that the parametric model arrives precisely coordinated at the works’ site.

  • STRUCTURAL CALCULATION
  • SIZING OF FACILITIES
  • CLASH DETECTION
  • CHECKING WITH THE CONSTRUCTION MANAGEMENT
WORKS’ PROGRAMMING

CONSTRUCTION PROJECT SCHEDULE

The BIM approach enables us to carry out works’ programming through the model which will generate an accurate, credible Gantt chart to be included in the works’ supervision and management plan.

In BIM we are talking about several dimensions, from 3D to 7D. To be precise, the fourth dimension, which adds the time factor to the model, allows us to relate each of the components with each works’ stage. Using this approach, the construction scheduling is included in the model which enables a simulation to be carried out prior to the real construction. This option is incredibly useful in view of the efficiency it lends to the process. We are also going to obtain the great advantage of having available up-to-date works’ planning at all times.

  • GETTING A CONSTRUCTION SCHEDULE
  • CONSULTATION WITH STAKEHOLDERS
  • UPDATING OF SCHEDULE
  • MONITORING AND REVIEW
BUDGET CONTROL

BUDGET MONITORING

Cost control is a major headache for contractors and promoters. In this new environment, accuracy, safety and control become powerful allies from an economic perspective.

The calculation of a works’ budget associated with a model allows us to obtain, at any time of the process, the construction cost in a simple, precise way. If the modelling rules are followed, it is the computer that gets the measuring automatically and the items are associated with their price. What’s more, a major benefit to be borne in mind is the possibility of assessing the impact that each change or incident will have on the general cost of the building before taking any decision. When all the information is available, the decision time is reduced and deadlines are streamlined.

  • COST ASSIGNMENT
  • BUDGETING
  • IMPACT OF THE CHANGES
  • MONITORING AND UPDATING
DATA MANAGEMENT

DATA MANAGEMENT

The obtaining of data from a model, its interpretation and usage in the construction process ensures the control of all the building parameters and the subsequent management of the entire life cycle of the property.

This new construction environment influenced by industry 4.0 generates the perfect context for a new form of building management. The parameterisation of each part of the model generates a series of data which are inherently the Big Data of the property. All of them can be cross-referenced with each other and related with the other buildings which will bring about, inter alia, ongoing improvement in the efficiency of future projects. It will also help with the monitoring and maintenance of the constructed building, simplifying the facilities management, what means, the carrying out of repairs, the replacement of appliances, the calculation of the services performance of installations, inspections…

  • DATA STANDARDISATION PARAMETERS
  • EXTRACTION DATA FROM THE PROJECT
  • CONSTRUCTION PLANNING
  • DATA ANALYSIS
  • MAINTENANCE OF THE BUILDING
SAFETY

SAFETY

From the very outset of each project, including the works and until we reach the final management of the building, we monitor each of the aspects to be involved and we coordinate them with each other in perfect harmony. In this way, we provide the safety level which we know that each client and each project deserves.

COOPERATION

COOPERATION

Good management involves, amongst many other factors, being able to promote a healthy efficient work environment. With this in mind, cooperation between all the stakeholders is essential. The BIM philosophy is firmly based on this concept, simplifying the communication, implementation and access to information.

EFFICIENCY

EFFICIENCY

Each aspect of the project is perfectly programmed and planned when the works start. Each change shall be analysed and decided in a speedy, smooth manner. And in this way greater efficiency is achieved. Each participant will be able to perform his work with the confidence and convenience afforded by being highly organised, in such a way that the process flows to the desired quality.

CONTROL

CONTROL

The model gives us with the measurements and guarantees the calculation, all the elements are integrated therein, we monitor the materials, the costs, the structures, the planning, the management, the implementation…  Unforeseen aspects are always arising which make the process hard and interrupt it, but based on this new approach we can control them speedily and securely, offering immediate, direct solutions.